图书简介
Power Plant Instrumentation and Control Handbook, Second Edition, provides a contemporary resource on the practical monitoring of power plant operation, with a focus on efficiency, reliability, accuracy, cost and safety. It includes comprehensive listings of operating values and ranges of parameters for temperature, pressure, flow and levels of both conventional thermal power plant and combined/cogen plants, supercritical plants and once-through boilers. It is updated to include tables, charts and figures from advanced plants in operation or pilot stage. Practicing engineers, freshers, advanced students and researchers will benefit from discussions on advanced instrumentation with specific reference to thermal power generation and operations. New topics in this updated edition include plant safety lifecycles and safety integrity levels, advanced ultra-supercritical plants with advanced firing systems and associated auxiliaries, integrated gasification combined cycle (IGCC) and integrated gasification fuel cells (IGFC), advanced control systems, and safety lifecycle and safety integrated systems.
I. Introduction 1. Introduction; 2. Fundamental Knowledge about Basic Process; 3. Process Parameters and Ranges II. Main Equipment 1. Overview of Types, Functions, and Description of Main Equipment; 2. Steam Generator: Boiler; 3. Turbine Types; 4. Generator; 5. Boiler Feed Pump and Condensate Extraction Pump with Associated Measurements; 6. Deaerators and Heaters; 7. Function and Description of CW and ACW Systems; 8. Demineralizing Plant’s Function and Description; 9. Basic System Functions and Description of Coal Handling; 10. Basic System Functions and Description of ASH Handling III. Plant P&ID Discussions 1. Introduction (P&ID); 2. Main Steam (P&ID); 3. Reheat Steam (P&IDs): Cold and Hot Reheat; 4. Extraction Steam (P&IDs): Bleed Steam; 5. Auxiliary Steam (P&IDs); 6. Feed Water System (P&ID); 7. Condensate System (P&IDs); 8. Heater Drain and Vent (P&IDs); 9. Air and Flue Gas System (P&IDs); 10. Cogeneration P&ID; 11. Miscellaneous Other Systems (P&ID) IV. General Instruments 1. Introduction; 2. Pressure Measurement: Various Measuring Points and Range Selection; 3. Temperature Measurement: Various Measuring Points and Range Selection; 4. Flow Measurement, Various Measuring Points, Various Types, and Range Selection; 5. Level Measurement V. Special Instrument 1. Special Instruments; 2. Vibration and Turbovisory Instruments; 3. Gas Analyzers; 4. Steam and Water Analysis System; 5. Sample Conditioning System; 6. Blow Down and Dosing Control; 7. Analyzers for Air Pollution Monitoring and Control (NOX Control) VI. Final Control Element 1. Valves and Actuators; 2. Control Valve Types; 3. Dampers and Miscellaneous other FCEs; 4. Actuators; 5. Accessories VII. Intelligent Control System 1. Basics (Discussion on Intelligent Network System); 2. PLC System: Introduction; 3. Annunciation and Sequence of Events: Preamble; 4. Integrated DCS-DDC MIS: Preamble; 5. MMI and Recording: Introduction; 6. MIS: Introduction VIII. Boiler Control System 1. Basic Control Requirements; 2. Steam Pressure Control with Load Index; 3. Air Flow Control; 4. Fuel Flow Control; 5. Coal Mill Control-Mill Air Flow for TT Boiler; 6. Furnace Draft Control; 7. Drum-Level and Feedwater Controls; 8. Superheater Temperature Control; 9. Reheat Temperature Control; 10. Miscellaneous Boiler Controls, including Overfire Air Dampers; 11. HP-LP Bypass System; 12. Boiler OLCS: Introduction to Interlock and Protection of Boiler BMS, SADC, and SB Control IX. Turbo Generator Control System 1. Introduction; 2. Electro Hydraulic Governor Control System; 3. Turbine Protection System; 4. ATRS; 5. ATT System; 6. Thermal Stress Evaluator; 7. LPBP System; 8. Turbine Controls: Seal Steam Pressure Control System; 9. Hydrogen Seal Oil System and Differential Pressure Control; 10. Generator Control System; 11. Condenser Level and Deaerator Level Control System; 12. Various TG Options and Miscellaneous TG Controls X. Coordinated Control System 1. Introduction; 2. Coordinate Control Mode; 3. Turbine Follow Mode; 4. Boiler Follow Mode; 5. Run Back System; 6. Discussions and Explanations XI. Balance of Plant Control System 1. Balance of Plant: Introduction; 2. BFP Recirculation Control; 3. CEP Recirculation Control; 4. GSC Minimum Flow Control; 5. Deaerator (Pressure) Control; 6. LP Heater Level Control; 7. HP Heater Level Control; 8. Ejector Control and TAS XII. Installation Practices 1. Introduction; 2. Pipe Valve Fitting Material Specification and Rating; 3. Mechanical Installation of Instruments; 4. Electrical Installation of Instruments XIII: Advanced Ultra-Supercritical Thermal Power Plant and Associated Auxiliaries XIV: Plant safety life cycle and Safety Integrated level Appendix I. Process and Mechanical Standard Table; II. Electrical Data and Tables; III. ISA Standard, Materials, Human Engineering, and Control Room; IV. Network Control and Communication; V. Super/Ultra Super Critical Power Plants; VI. Integrated Gasifier and Combined Cycle Plant (Pollution Control); VII. A Few Operational Features of the Unit
Trade Policy 买家须知
- 关于产品:
- ● 正版保障:本网站隶属于中国国际图书贸易集团公司,确保所有图书都是100%正版。
- ● 环保纸张:进口图书大多使用的都是环保轻型张,颜色偏黄,重量比较轻。
- ● 毛边版:即书翻页的地方,故意做成了参差不齐的样子,一般为精装版,更具收藏价值。
关于退换货:
- 由于预订产品的特殊性,采购订单正式发订后,买方不得无故取消全部或部分产品的订购。
- 由于进口图书的特殊性,发生以下情况的,请直接拒收货物,由快递返回:
- ● 外包装破损/发错货/少发货/图书外观破损/图书配件不全(例如:光盘等)
并请在工作日通过电话400-008-1110联系我们。
- 签收后,如发生以下情况,请在签收后的5个工作日内联系客服办理退换货:
- ● 缺页/错页/错印/脱线
关于发货时间:
- 一般情况下:
- ●【现货】 下单后48小时内由北京(库房)发出快递。
- ●【预订】【预售】下单后国外发货,到货时间预计5-8周左右,店铺默认中通快递,如需顺丰快递邮费到付。
- ● 需要开具发票的客户,发货时间可能在上述基础上再延后1-2个工作日(紧急发票需求,请联系010-68433105/3213);
- ● 如遇其他特殊原因,对发货时间有影响的,我们会第一时间在网站公告,敬请留意。
关于到货时间:
- 由于进口图书入境入库后,都是委托第三方快递发货,所以我们只能保证在规定时间内发出,但无法为您保证确切的到货时间。
- ● 主要城市一般2-4天
- ● 偏远地区一般4-7天
关于接听咨询电话的时间:
- 010-68433105/3213正常接听咨询电话的时间为:周一至周五上午8:30~下午5:00,周六、日及法定节假日休息,将无法接听来电,敬请谅解。
- 其它时间您也可以通过邮件联系我们:customer@readgo.cn,工作日会优先处理。
关于快递:
- ● 已付款订单:主要由中通、宅急送负责派送,订单进度查询请拨打010-68433105/3213。
本书暂无推荐
本书暂无推荐